The weathering certificate is the shipping document the charcoal factory itself signs — and the first carriers reject when dates and photos fail.

What a charcoal weathering certificate is — and who signs it

A weathering certificate is a document the charcoal producer issues and signs, confirming that after production the unpacked charcoal was weathered — stored under cover but in the open air — for at least 14 days, and did not exceed 40 °C on the day of packing. That SP 978 basis is restated by CINS (September 2024). Behind the rule: fresh charcoal self-heats; the yard hold ages it before sealing. The certificate shows dates, temperatures, dated yard photos.

Three signatures, none interchangeable: the producer signs the weathering certificate, a laboratory the self-heating test report, an independent surveyor the vanning report (Maersk, April 2025). CINS's name for it: Weathering Report. Our yard holds unpacked briquettes 14 days before packing starts. The certificate is one layer of a stack: which documents a charcoal DG shipment needs and who issues each maps the rest — dangerous goods declaration, MSDS, vanning survey.

The steam-treatment alternative: inert gas and a 24-hour hold

SP 978 permits one alternative to 14-day weathering: steam treatment after pyrolysis, a cooling period, packing under inert gas, then a 24-hour hold before transport (CINS, September 2024). CINS scopes that route to "Biochar", not commonly produced charcoal — and carrier templates assume the yard route — Maersk's fields are weathering fields (1 October 2025) — so coconut-shell exporters, ours included, certify weathering.

What the certificate does not do

A weathering certificate never makes charcoal non-dangerous goods, never replaces a self-heating test report, never substitutes for the vanning survey — it evidences carriage conditions only.

The yard log behind the certificate

Every credible weathering certificate sits on a yard log — dated yard records of production, weathering and packing. Ours is on file at the Gunung Sindur yard, supplied on request.

Three requirement layers: the Code, industry guidance, carrier templates

No universal template fixes the certificate contents: the Code sets conditions, CINS defines a four-field report, each carrier grafts its own list — the booking carrier's governs. CMA CGM's 2025 flyer lists it beside DGD and vanning survey; Maersk collects all three at gate-in.

Layer Source + date What it demands
The Code IMDG SP 978 (via CINS, Sept 2024) 14-day weathering under cover in open air from end of pyrolysis; ≤40 °C on packing day
Industry guidance CINS Weathering Report (Sept 2024) Production date; packaging date; packaging type; mean packaging-day temperature, °C
Carrier template Maersk, eff. 1 Oct 2025 — none newer as of July 2026 Producer letterhead, signed/stamped; issue, production, weathering and packing start/end dates; photos of weathering, packing, temperature; booking/container/batch; particle size

Anatomy of the certificate we issue

Issued on PT. Coco Reina Global Charcoal Indonesia letterhead, our certificate reconciles four date sets — production completion, weathering start/end, packing start/end — against the batch number it names, signed by Mohamad Sinno. The production-to-packing timeline is the spine — its clock starts when pyrolysis ends (CINS, September 2024). Each stuffing day the material is checked — measured 20–30 °C against the 40 °C ceiling — feeding its temperature logs. Photos must follow the carrier-graded spec: daylight, straight angle, roof visible, dated (Maersk, April 2025).

The certified periods run two stages: raw-material curing at least 14 days before processing, then the 14-day SP 978 post-production hold — at least 28 days, raw-material receipt to stuffing. Booking and container numbers join at allocation — Maersk's batch number linkage.

One timeline, three documents

The dates do not stay on the certificate: production date, packing date, packing-day temperature are the transport document's three new entries (Hapag-Lloyd, December 2025); the charcoal DGD, field by field walks it. The surveyor checks the report is "available and credible" (CINS); discrepancies, and the container is not loaded (Maersk, April 2025).

Red flags in weathering paperwork

The fastest checks on a weathering certificate are arithmetic and photographic: dates that cannot reconcile with a 14-day weathering window, photos that cannot show the required conditions. Carrier verification ran ahead of the Code — MSC enforced from 1 November 2025 (2 October 2025; as of July 2026). Six failures to catch first:

The same lens applies at stuffing; the vanning survey and the container photos carriers expect covers that layer. The anatomy above is our sample of a charcoal 14-day weathering certificate meeting the shipping requirement — for a recent batch's redacted specimen, WhatsApp +628213924038.

This page is general information on charcoal transport documentation, not legal or dangerous-goods advice. Confirm current IMDG and carrier requirements with your carrier or a licensed dangerous-goods specialist before shipping.